Project Fuels Shutdown Coryton 2006
Problem:
Onyx UK Limited won a major shutdown at BP Coryton, the remit was to provide the shutdown with 160 operatives, 40 of these operative were sourced from within the Onyx UK Limited Group, the other 120 had to be attained locally and on a temporary basis.
Solution:
Onyx UK Limited approached Calahans to provide 50 industrial services operatives, please see list below of skilled operatives that were provided throughout the shutdown.
Unit Cleaners
Vessel Entry Controllers (VEC)
Ally Mac Operators
Confined Space Entry Cleaners (CSE)
Fire Watchers
50 operatives were supplied for an 8 week period; the shutdown was successfully completed with no accidents or incidents from the labour that Calahans provided.